Skip to content
  • עבריתעברית
Adi Surveying
  • Home
  • About us
  • Geodetic monitoring
    • Automatic Total Station
    • Precise Levelling
    • Database Management
  • Engineering
  • Land Survey
    • Cadastre
    • Expropriations
    • Topographic measurements
    • Zoninig scheme Compilation
  • QA-QC
  • Contact Us
Menu
  • Home
  • About us
  • Geodetic monitoring
    • Automatic Total Station
    • Precise Levelling
    • Database Management
  • Engineering
  • Land Survey
    • Cadastre
    • Expropriations
    • Topographic measurements
    • Zoninig scheme Compilation
  • QA-QC
  • Contact Us
Road-60
Road-60 Eng

Road-60

  • Post Author:אודליה טולדנו צוראל
  • Post published:7 בJune 2020
  • Post Category:ATS / Database management / Geodetic monitoring
  • Post Comments:0 Comments

The Road 60 project is part of the 12 km Begin's Road project, in Jerusalem. The project includes two additional tunnels to the Gilo tunnel, 350 m long and 900…

Continue Reading Road-60
Kochav Hayarden – Pumped Hydroelectric Energy Storage (PHES)

Kochav Hayarden – Pumped Hydroelectric Energy Storage (PHES)

  • Post Author:אודליה טולדנו צוראל
  • Post published:6 בJanuary 2020
  • Post Category:ATS / Database management
  • Post Comments:0 Comments

ADI Ltd. is monitoring the PHES project in Kochav Hayarden. Sinohydro Ltd. is excavating the tunnel for the Pumped Hydroelectric Energy Storage (PHES) in Kochav Hayarden, using drilling and blasting.…

Continue Reading Kochav Hayarden – Pumped Hydroelectric Energy Storage (PHES)
Geodetic Monitoring – Red Line light rail
Igor tunnel_en

Geodetic Monitoring – Red Line light rail

  • Post Author:אודליה טולדנו צוראל
  • Post published:18 בAugust 2019
  • Post Category:ATS / Geodetic monitoring / Home / precise levelling
  • Post Comments:0 Comments

Monitoring six Red Line stations, Tel Aviv's first light rail line, with Automatic Total Station and precise levelling. The monitoring system includes thousands of bolts and hundreds of prisms, on…

Continue Reading Geodetic Monitoring – Red Line light rail
The fifth Line

The fifth Line

  • Post Author:אודליה טולדנו צוראל
  • Post published:11 בAugust 2019
  • Post Category:ATS / Geodetic monitoring
  • Post Comments:0 Comments

ADI Ltd. carried out geodetic monitoring using Automated Total Station in the fifth line tunnel to Jerusalem, in a section in the Beit Shemesh area. The purpose of the monitoring…

Continue Reading The fifth Line
Sarona Hotel
Sarona_ats2_en

Sarona Hotel

  • Post Author:אודליה טולדנו צוראל
  • Post published:11 בAugust 2019
  • Post Category:ATS / Geodetic monitoring
  • Post Comments:0 Comments

ADI Ltd. measures 5 ATSs and dozens of prisms, above the surface, around the Kaplan Bridge and inside the TA light rail tunnels, to monitor the movement of the Sarona…

Continue Reading Sarona Hotel

Details

  • 03-9623817
  • Address 17 A' Lazarov St., New Ind. Area, Reshon Lezion 7565424
  • office@adiltd.co.il

Search

Close Menu