The fifth Line

Location:

Bait Shemesh to Jerusalem

Client:

Zublin Spezialtiefbau GmbH

ADI Ltd. carried out geodetic monitoring using Automated Total Station in the fifth line tunnel to Jerusalem, in a section in the Beit Shemesh area. The purpose of the monitoring was to monitor tunnel movements and settlements as a result of sealing karstic cavities. This project is planned to provide Jerusalem 65,000 cubic meters per hour, with a 2.59 meter diameter pipeline that will cross a 13.5 km tunnel, about 300 meters deep, between Kisalon and Ein Kerem.