Road-60
The Road 60 project is part of the 12 km Begin's Road project, in Jerusalem. The project includes two additional tunnels to the Gilo tunnel, 350 m long and 900…
The Road 60 project is part of the 12 km Begin's Road project, in Jerusalem. The project includes two additional tunnels to the Gilo tunnel, 350 m long and 900…
ADI Ltd. is monitoring the PHES project in Kochav Hayarden. Sinohydro Ltd. is excavating the tunnel for the Pumped Hydroelectric Energy Storage (PHES) in Kochav Hayarden, using drilling and blasting.…
The construction of a bypass road in north Ashdod, construction of a bridge over Nahal Lachish and the expansion of Herzl Street in the city. ADI Ltd. carried out topographic…
Construction of a private gas station. Adi's expert team measures the turbine bases with extremely high positioning accuracy - 0.5 mm for height and 0.2 mm for location - for…
In this project, Adi Ltd. performs topographic measurements, expropriations, land arrangements, cadastre, zoning scheme compilation and property registration. The number of residents in the neighborhood is expected to grow from…
Experienced teams of ADI's surveyors perform quality control measurements of control networks, rails and various elements, along the red line of the Tel Aviv Light Rail. The work sites were…
Monitoring six Red Line stations, Tel Aviv's first light rail line, with Automatic Total Station and precise levelling. The monitoring system includes thousands of bolts and hundreds of prisms, on…
A 9-meter crane extension project at Ashdod Port. A skilled team of ADI surveyors measured and determined the crane's cutting and welding locations. The task required a very high accuracy,…
A team of ADI surveyed the exact location of 12 turbines and 12 boilers whike erecting the Durad power plant. Dorad is a private power plant for power generation near…
ADI Ltd. carried out geodetic monitoring using Automated Total Station in the fifth line tunnel to Jerusalem, in a section in the Beit Shemesh area. The purpose of the monitoring…