Skip to content
  • עברית
Adi Surveying
  • Home
  • About us
  • Geodetic monitoring
    • Automatic Total Station
    • Precise Levelling
    • Database Management
  • Engineering
  • Land Survey
    • Cadastre
    • Expropriations
    • Topographic measurements
    • Zoninig scheme Compilation
  • QA-QC
  • Contact Us
Menu
  • Home
  • About us
  • Geodetic monitoring
    • Automatic Total Station
    • Precise Levelling
    • Database Management
  • Engineering
  • Land Survey
    • Cadastre
    • Expropriations
    • Topographic measurements
    • Zoninig scheme Compilation
  • QA-QC
  • Contact Us
Road-60
Road-60 Eng

Road-60

  • Post Author:
  • Post published:7 בJune 2020
  • Post Category:ATS / Database management / Geodetic monitoring

The Road 60 project is part of the 12 km Begin's Road project, in Jerusalem. The project includes two additional tunnels to the Gilo tunnel, 350 m long and 900…

Continue Reading Road-60
Kochav Hayarden – Pumped Hydroelectric Energy Storage (PHES)

Kochav Hayarden – Pumped Hydroelectric Energy Storage (PHES)

  • Post Author:
  • Post published:6 בJanuary 2020
  • Post Category:ATS / Database management

ADI Ltd. is monitoring the PHES project in Kochav Hayarden. Sinohydro Ltd. is excavating the tunnel for the Pumped Hydroelectric Energy Storage (PHES) in Kochav Hayarden, using drilling and blasting.…

Continue Reading Kochav Hayarden – Pumped Hydroelectric Energy Storage (PHES)

Details

  • 03-9623817
  • Address 17 A' Lazarov St., New Ind. Area, Reshon Lezion 7565424
  • office@adiltd.co.il

Search

Close Menu
Accessibility by WAH