Road-60
The Road 60 project is part of the 12 km Begin's Road project, in Jerusalem. The project includes two additional tunnels to the Gilo tunnel, 350 m long and 900…
The Road 60 project is part of the 12 km Begin's Road project, in Jerusalem. The project includes two additional tunnels to the Gilo tunnel, 350 m long and 900…
ADI Ltd. is monitoring the PHES project in Kochav Hayarden. Sinohydro Ltd. is excavating the tunnel for the Pumped Hydroelectric Energy Storage (PHES) in Kochav Hayarden, using drilling and blasting.…
Monitoring six Red Line stations, Tel Aviv's first light rail line, with Automatic Total Station and precise levelling. The monitoring system includes thousands of bolts and hundreds of prisms, on…
ADI Ltd. carried out geodetic monitoring using Automated Total Station in the fifth line tunnel to Jerusalem, in a section in the Beit Shemesh area. The purpose of the monitoring…
ADI Ltd. measures 5 ATSs and dozens of prisms, above the surface, around the Kaplan Bridge and inside the TA light rail tunnels, to monitor the movement of the Sarona…